Identify the Energy Source
Every generator requires a measurable external input.
Start typing to search the FARAD site.
FARAD evaluates emerging technologies according to identifiable input energy, net output, operating effects, safety and independent validation.
Every generator requires a measurable external input.
Include auxiliary loads, drag, pumping effects and losses.
Use credible laboratory or field testing.
Up to 30 kW, 720 kWh/day and 262,800 kWh/year, with a preliminary price near $318,000.
Approximately 5 kWh per 100 kilometers at a preliminary price near $2,198.
Neither technology should be presented as validated until input energy, net output, safety, durability and operating effects are independently documented.