Seeking qualified pilot sites, infrastructure partners and strategic investors.
Controlled technical evaluation

Pilot Projects

A credible pilot should establish net operational and economic results—not merely gross output.

Screening

Review site data.

Assessment

Identify recoverable energy.

Technical Review

Evaluate pressure loss and safety.

Pilot Installation

Measure generation and system effects.

Performance Review

Document net results.

Ideal Site

  • Continuous flow
  • Documented pressure and flow
  • Known pressure reduction or elevation
  • Installation space
  • Safe bypass

Organizational Readiness

  • Engineering staff
  • Permission to collect data
  • Operational coordination
  • Interest in energy efficiency

Pilot Measurement Plan

Hydraulic

Flow, pressure and head.

Electrical

Gross, auxiliary and net output.

Operational

Downtime and maintenance.

Economic

Avoided energy value and project cost.

Become a Pilot-Project Partner

Submit a Candidate Site
Request Evaluation